by designTalk to us
Digital by DesignProjectJ/092 min read

Building the golden thread into a housebuilder’s process

A housebuilder asked us to build the golden thread of information into how it designs and delivers homes. We defined Building Safety Act roles, mapped the Gateways and built a site evidence app.

As building safety legislation changed, a housebuilder came to us wanting to lead rather than follow. The brief was to make the golden thread of information a basic principle of its design, documentation and compliance, built into development and delivery from the start rather than added on later.

Our response was strategic and technical. We combined digital tools, clear roles and compliance mapping in one framework that goes further than a checklist.

Roles first

We started by setting out roles and responsibilities under the Building Safety Act. This meant:

  • Identifying the need for a Principal Designer under the Building Safety Act and supporting the appointment
  • Advising on how a document controller fits into the team
  • Realigning contracts so the Employer’s Requirements (ERs) and Employer’s Information Requirements (EIRs) were clear and complete

With that in place, the golden thread could start early: before design freeze, before procurement and well before construction.

A digital loop from site to cloud

We developed a custom mobile app for the client’s site teams. With it they can:

  • Log photographs of safety-critical work as it is built
  • Complete quality checklists on site, in real time
  • Geo-tag evidence by plot and sync it directly to the client’s common data environment, Autodesk Construction Cloud (ACC)

Issues were picked up and resolved early, the data was stored in one place, and the client could show compliance without delay or duplicated effort.

Approvals at each Gateway

We mapped the client’s project lifecycle against the new Gateway process:

  1. 01

    Gateway One

    Design input on fire safety at planning stage.

  2. 02

    Gateway Two

    Compliance checks and sign-off before construction starts.

  3. 03

    Gateway Three

    Final approvals before occupation.

Using the issue tracking and approval workflows in ACC, we built that sequence into the design process, so the documentation lined up with the regulations and with the client’s own oversight.

The outcome

The housebuilder now meets the regulatory baseline and goes beyond it, which positions it as a progressive, transparent and trusted developer. The project shows how a digital-first approach can turn a regulatory duty into a competitive advantage.

Drawings and images

1 / 1

Digital by Design

Models, automation and the tools that keep drawings honest on site.

See Digital

Something to talk through?

If this sounds like your project, the people who wrote it are the people you would work with.

StudioAlina House, St. Vincent Street, Liverpool L3 5XW
Phone0151 708 6121
Emailinfo@by-design.group